Product Details
Place of Origin: Nanjing, China
Brand Name: Union
Certification: CE, ISO9001
Model Number: UNRC-1
Payment & Shipping Terms
Minimum Order Quantity: 1*20GP
Price: Negotiable
Packaging Details: wrap film packaging
Delivery Time: 20 working day from we receive the deposit
Payment Terms: L/C, T/T
Supply Ability: 2000T per month
Material: |
Cold-rolled Steel |
Color: |
Customized |
Size: |
Customized |
Surface Treatment: |
Powder Coating /Galvanized |
Packing: |
Film Wrapping |
Width: |
500-1500mm |
Material: |
Cold-rolled Steel |
Color: |
Customized |
Size: |
Customized |
Surface Treatment: |
Powder Coating /Galvanized |
Packing: |
Film Wrapping |
Width: |
500-1500mm |
Attribute | Value |
---|---|
Material | Cold-rolled Steel |
Color | Customized |
Size | Customized |
Surface treatment | Powder Coating /Galvanized |
Packing | Film Wrapping |
Width | 500-1500mm |
35m Height Steel Self-supporting Warehouse Racking System with Seismic Report
"Self-supporting racking," also known as rack supported buildings or self-supporting warehouses, refers to a storage system that doubles as the actual structure of the building. In these systems, the racking not only supports the stored goods but also the walls and roof of the warehouse itself. This design eliminates the need for as many internal support columns or beams, as the racking system is engineered to bear the load.
Product name | Self supported buildings |
---|---|
Material | Q235/355 Steel |
Certification | ISO9001,CE |
Design | AutoCAD |
Length | Customized |
Width | Customized |
Finished | Power coated |
Used | industry normal warehouse, cold storage, automated warehouse |
Firstly, you give your area size, tell us your requirement for layers and loading capacity for us to make design.
1 year guarantee for free accessories and 10 years for the rack will not fall.
We provide all sets installation drawing, you can choose find installation team yourself or we find, our engineer can arrive on site for guidance.
Design drawing → Confirm drawing → Quotation → PI → Confirm PI → Arrange 30% deposit → Manufacture → QC inspect → Pay balance → Shipping