Product Details
Place of Origin: Nanjing, China
Brand Name: Union
Certification: CE, ISO9001
Model Number: UNMF-1
Payment & Shipping Terms
Minimum Order Quantity: 1*20GP
Price: Negotiable
Packaging Details: wrap film packaging
Delivery Time: 20 working day from we receive the deposit
Payment Terms: L/C, T/T
Supply Ability: 2000T per month
Material: |
Cold-rolled Steel |
Color: |
Customized |
Size: |
Customized |
Surface Treatment: |
Powder Coating /Galvanized |
Packing: |
Film Wrapping |
Width: |
500-1500mm |
Material: |
Cold-rolled Steel |
Color: |
Customized |
Size: |
Customized |
Surface Treatment: |
Powder Coating /Galvanized |
Packing: |
Film Wrapping |
Width: |
500-1500mm |
Attribute | Value |
---|---|
Material | Cold-rolled Steel (Q235/355 Steel) |
Color | Customized (RAL System) |
Size | Customized |
Surface treatment | Powder Coating / Galvanized |
Packing | Film Wrapping |
Width | 500-1500mm |
Certification | ISO9001, CE |
Design | AutoCAD |
Used | Manpower operation; industry normal warehouse, cold storage |
Powder Coating Cold Storage Steel Mezzanine Floor For Warehouse Storage
Mezzanine floors can be constructed using various materials, such as steel, structural aluminum, or other sturdy materials. The structure consists of columns or supports that bear the load, beams that provide structural support, and decking panels that form the walking surface. The design and construction of the mezzanine floor are tailored to meet specific load-bearing requirements and local building codes.
Component | Specification |
---|---|
Support Beam | Customized length, thickness 2.0mm |
Upright | 80*60; 90*70; 100*70; 120*95; thickness 2-2.5mm |
Adjustable | Adjusted by 50mm pitch |
Surface Finish | Powder coating & Galvanized |
Frame, beam steel decking, floor decking, handrail, staircase and standard parts.
Firstly, provide your warehouse size and requirements for rack size, layers and loading capacity for us to make design.
1 year guarantee for free accessories and 10 years for the rack will not fall.
We provide all sets installation drawing. You can choose to find installation team yourself or we can arrange. Our engineer can arrive on site for guidance.
Design drawing → Confirm drawing → Quotation → PI → Confirm PI → Arrange 30% deposit → Manufacture → QC inspect → Pay balance → Shipping