logo

Jiangsu Union Logistics System Engineering Co., Ltd. dorothy@unionrack.com 86-025-86137721

Jiangsu Union Logistics System Engineering Co., Ltd. Company Profile
products
Home > products > Rack Supported Buildings > Robotic Clad Rack Building Galvanized Automated Pallet Racking System

Robotic Clad Rack Building Galvanized Automated Pallet Racking System

Product Details

Place of Origin: Nanjing, China

Brand Name: Union

Certification: CE, ISO9001

Model Number: UNRC-1

Payment & Shipping Terms

Minimum Order Quantity: 1*20GP

Price: Negotiable

Packaging Details: wrap film packaging

Delivery Time: 20 working day from we receive the deposit

Payment Terms: L/C, T/T

Supply Ability: 2000T per month

Get Best Price
Product Details
Highlight:

Robotic Clad Rack Building

,

Galvanized Automated Pallet Racking System

,

Galvanized Clad Rack Building

Material:
Cold-rolled Steel
Color:
Customized
Size:
Customized
Surface Treatment:
Powder Coating /Galvanized
Packing:
Film Wrapping
Width:
500-1500mm
Material:
Cold-rolled Steel
Color:
Customized
Size:
Customized
Surface Treatment:
Powder Coating /Galvanized
Packing:
Film Wrapping
Width:
500-1500mm
Product Description

Clad rack buildings with automated systems and robotic equipment for the handling of goods

 

Clad Rack Warehouses can be made up of any type of storage system as their main feature is for the racking to form part of the building structure.
In this system, the racking not only supports the load of the stored goods, but also the load of the building envelope, as well as external forces such as wind or snow.

Advantages:

1.Full use of the surface area
the warehouse is designed at the same time as the racks and only occupies the space required, without intermediate pillars that influence their distribution.
2.Optimisation of height
as with the surface area, the height will be only that which is required. At the same time, the upper trusses or girders require less height and incline being directly supported on the racking.
3.Maximum height of the construction
You can build to any height, it only depends on local regulations or the scope of the handling means which are used, being able to exceed 45 m high (which would be complex and expensive in traditional construction).
4.Simpler construction
The entire structure is assembled on a concrete slab of suitable thickness to achieve uniform distribution of the forces on the foundation; there isn’t a high concentration of loads.
5.Less time for completion
Once the slab is built, the entire structure and cladding are progressively and concurrently installed.
6.Cost savings
As a general rule, the cost of a clad-rack warehouse is less than the more traditional racks. The greater the construction height, the more profitable the clad-rack system.
7.Minimal civil works
it only requires the construction of the slab on the ground and, in some cases, a waterproof wall between one and two metres high. In which case the operations area needs to be expanded for receipt and dispatch, a traditional
building can be built, but of sufficient height without reaching the total height of the warehouse.
8.Easily removable
Being a structure formed by standard rack elements that come pre-assembled or bolted, they can be dismounted with ease and a high percentage of components recovered.

 

 

Product name Self supported buildings
Material Q235/355 Steel
Certification ISO9001,CE
Design AutoCAD
Length Customized
Width Customized
Finished Power coated
Used  industry normal warehouse, cold storage, auotamed warehouse

 

 

 

Product Display:

 

Robotic Clad Rack Building Galvanized Automated Pallet Racking System 0

 

 

Union Mezzanine floor upright and Beam section:

Robotic Clad Rack Building Galvanized Automated Pallet Racking System 1

 

 

Robotic Clad Rack Building Galvanized Automated Pallet Racking System 2

 

Certificate

CE, ISO

Robotic Clad Rack Building Galvanized Automated Pallet Racking System 3

 

Our Exhibition

Robotic Clad Rack Building Galvanized Automated Pallet Racking System 4

Q&A

 

1.I am intersted in self supported, but I am not that professional, whatshould we do firstly?

 

Firstly, you give your area size, tell us your requirement for layers and loading capacity for us to make design

 

2. What is your warranty?

1 year guarantee for free accesssories and 10 years for the rack will not fall.

 

3. Do you support installation?

We provide all sets installation drawing, you can choose find installation team yourself or we find, our enginner can arrive on site for guidance.

 

4.What to purchase your product?

      Design drawing →Confirm drawing→Quotation→PI→Confirm PI→Arrange 30%deposit→Manufacture→QC inspect→Pay balance→Shipping

    

     5.What’s your advantage?

     1) Factory price: factory direct sale competitive price.

     2)Static Calculation for Seismic Factor

     3)Competitive Design&Structure Manufacturer

     4)FreeConsultationon StorageSolutions