Jiangsu Union Logistics System Engineering Co., Ltd. dorothy@unionrack.com 86-025-86137721
Product Details
Place of Origin: Nanjing, China
Brand Name: Union
Certification: CE, ISO9001
Model Number: UNDR-1
Payment & Shipping Terms
Minimum Order Quantity: 1*20GP
Price: Negotiable
Packaging Details: wrap film packaging
Delivery Time: 20 working day from we receive the deposit
Payment Terms: L/C, T/T
Supply Ability: 2000T per month
Material: |
Cold-rolled Steel |
Color: |
Customized |
Size: |
Customized |
Surface Treatment: |
Powder Coating /Galvanized |
Packing: |
Film Wrapping |
Width: |
500-1500mm |
Material: |
Cold-rolled Steel |
Color: |
Customized |
Size: |
Customized |
Surface Treatment: |
Powder Coating /Galvanized |
Packing: |
Film Wrapping |
Width: |
500-1500mm |
Attribute | Value |
---|---|
Material | Cold-rolled Steel |
Color | Customized |
Size | Customized |
Surface treatment | Powder Coating / Galvanized |
Packing | Film Wrapping |
Width | 500-1500mm |
Industrial RAL color system warehouse steel heavy duty drive-in pallet rack designed for high-density storage solutions. This system reduces overall square footage requirements by 35% or more compared to standard pallet rack configurations.
Drive-in pallet racks and drive-thru racks are roll-formed for durability. Products are stored several pallets deep, with handling equipment entering the rack structure to slot or extract pallets.
Product Name | Drive in pallet rack |
Material | Q235 Steel |
Certification | ISO 9001, SGS |
Design | CAD |
Length | 1000-8000mm |
Width | 900-1500mm |
Finished | Power coated |
Used | Forklift operation; industrial warehouses, cold storage |
CE, ISO certified
Provide your warehouse dimensions and requirements for rack size, layers, and loading capacity for our design team.
1 year guarantee for free accessories and 10 years structural warranty.
We provide complete installation drawings. You can choose your own installation team or we can arrange our engineers for on-site guidance.
Design drawing → Confirm drawing → Quotation → PI → Confirm PI → 30% deposit → Manufacture → QC inspection → Balance payment → Shipping